Route BL1
Appearance
Route History
27 September 2025, the route commenced operation running between Waterloo Station and Lewisham Centre via Elephant & Castle, Burgess Park, Old Kent Road and New Cross Gate along the proposed Bakerloo Line extension. The route is operated by London General from their Waterloo (RA) garage using existing Enviro400 City EV bodied BYD DDs from Route 230. All journeys were free for the first week.