Route 282: Difference between revisions
Appearance
Created page with "{| class="wikitable" style="float:right; width:250px;" |+ '''Route Information''' |- | colspan="2" style="text-align:center;" | 250px |- ! Operator | Metroline West |- ! Garage | Greenford (G) |- ! PVR | 16 |- ! Vehicle | Enviro 400 Hybrid |- ! Start | Ealing Hospital |- ! End | Mount Vernon Hospital |- ! Service | 5:04 – 00:46 |- ! Length | 19km |}" |
No edit summary |
||
| Line 28: | Line 28: | ||
| 19km | | 19km | ||
|} | |} | ||
=Route History= | |||
'''7 march 2020,''' the route was retained by Metroline, at the same time, the Enviro 400s were replaced by Enviro 400 Hybrids. | |||
'''8 March 2025,''' the route was retained by Metroline. | |||
Revision as of 22:17, 4 October 2025
| Operator | Metroline West |
|---|---|
| Garage | Greenford (G) |
| PVR | 16 |
| Vehicle | Enviro 400 Hybrid |
| Start | Ealing Hospital |
| End | Mount Vernon Hospital |
| Service | 5:04 – 00:46 |
| Length | 19km |
Route History
7 march 2020, the route was retained by Metroline, at the same time, the Enviro 400s were replaced by Enviro 400 Hybrids.
8 March 2025, the route was retained by Metroline.